Projects

Carver Park Senior Center
Location: Bartow, FL
Completed: August 2008

Contains over 50,000 sq. ft. of 4" Spancrete hollowcore and 8" Spancrete hollowcore and solid slabs


  Hampton Inn Pinellas Park
Location: Pinellas Park, FL
Completed: August 2006

Contains over 74,200 sq. ft. of 8" Spancrete hollowcore plank

This project, a typical hotel application, included untopped and ceiling direct application with excellent results.


 
Heritage Bay Clubhouse
Location: Naples, FL
Completed: May 2008

Contains over 19,400 sq. ft. of 8" and 10" Spancrete hollowcore floor and roof plank and precast stair assemblies

This very challenging architectural design incorporated skewed and angled plank. Access during construction was difficult because of the need to stage the crane at various locations around the building in order to complete the project on time.


  John E. Polk Correctional Facility
Location: Sanford, FL
Completed: May 2009

Contains 82,800 sq. ft. of 4" Spancrete hollowcore and 8" Spancrete hollowcore and double tees

The construction sequence was critical on this tilt-wall job. FPI crews used several cranes for setting the double T's and hollowcore simultaneously.


 
McCabe Residence Spec 01
Location: South Naples, FL
Completed: March 2008

Contains over 3,600 sq. ft. of 8" Spancrete hollowcore and solid slabs

This project is a perfect example of how hollowcore can be utilized successfully in even the most challenging residential designs. FPI crews had to deal with extremely limited access in this tight residential neighborhood.


  Orlando Fire Station #1
Location: Orlando, FL
Completed: January 2009

Contains over 5,200 sq. ft. of 8" Spancrete hollowcore plank

Erecting it in downtown Orlando was this project’s biggest challenge.


 
Safety Harbor Elementary School
Location: Safety Harbor, FL
Completed: March 2009

Contains over 12,700 sq. ft. of 6" and 8" Spancrete hollowcore and solid slabs

This is a typical school application for FPI and Spancrete hollowcore.


  Sarasota Baptist Church
Location: Sarasota, FL
Completed: October 2006

Contains over 38,200 sq. ft. of 8" Spancrete hollowcore plank

Calculating angles and differing beam elevations, the FPI drafting department rose to the challenge of this project and the end result was a perfect job. In addition, this project site provided limited access for our installation crews.


 
First Baptist Church of Oviedo
Location: Oviedo, FL
Completed: September 2008

Contains over 3,300 sq. ft of 8" and 10" Spancrete Hollowcore floor and roof plank

In order to keep this job on schedule and accommodate the GC's construction sequence; erection of the final phase of project was completed from within the building! With the santuary completely covered, our erecting crew drove the crane and loads into the sanctuary and set the stadium seating in extremely tight surroundings.


 
 

Florida Precast Industries | 400 Deer Trail East | Sebring, FL 33876 | 888-633-1515 | F 863-655-1215
info@floridaprecastind.com